<a id="ch-12"></a>

## Chapter 12 — OT, IoT and cyber-physical security: data flows

### Learning outcomes

You will (1) write an approved flow matrix; (2) compare observed flows with it; (3) interpret unapproved and unused approved flows; and (4) turn the comparison into firewall changes.

### 12.1 The flow matrix

A flow matrix lists every permitted conversation: source, destination, port and purpose. It is the conduit table of Chapter 8 made precise enough to test. NCS has four approved flows: HMI-C to each PLC on Modbus/TCP 502, the historian polling PLC-R1, and GW-LOG to the vendor cloud on 443.

```python
"""Lab 12: compare observed synthetic flows with the approved flow matrix."""
approved = {("HMI-C", "PLC-R1", 502), ("HMI-C", "PLC-R2", 502), ("GW-LOG", "CLOUD-LOG", 443), ("HIST", "PLC-R1", 502)}
observed = [("HMI-C", "PLC-R1", 502), ("GW-LOG", "CLOUD-LOG", 443), ("OFFICE-7", "PLC-R2", 502),
            ("HIST", "PLC-R1", 502), ("GW-LOG", "PLC-R1", 502)]
for f in observed:
    print(f"{f[0]:8} -> {f[1]:9} :{f[2]:<4} {'approved' if f in approved else 'UNAPPROVED'}")
print("approved but not seen:", sorted(approved - set(observed)))
```

Run with `python3 lab_flows.py`. Verified output:

```text
HMI-C    -> PLC-R1    :502  approved
GW-LOG   -> CLOUD-LOG :443  approved
OFFICE-7 -> PLC-R2    :502  UNAPPROVED
HIST     -> PLC-R1    :502  approved
GW-LOG   -> PLC-R1    :502  UNAPPROVED
approved but not seen: [('HMI-C', 'PLC-R2', 502)]
```

The lab compares those four approved flows with five observed conversations.

The two unapproved rows, OFFICE-7 talking to PLC-R2 and GW-LOG reaching PLC-R1, are the ones to investigate first, while the unseen HMI-C to PLC-R2 flow may simply not have occurred during the capture. Chapter 27 later shows that the list was missing the historian's polling of PLC-R2, an approved flow nobody had written down.

### 12.2 Unapproved flows

OFFICE-7 talking Modbus to PLC-R2 is exactly what rule 9 allowed. It might be an engineer's spreadsheet macro, or malware. Either way it is a path from the office to a compressor controller. GW-LOG talking to PLC-R1 is stranger: the logger gateway has no reason to speak Modbus. It could be a vendor "integration" feature or a sign of compromise.

Priya traced both. OFFICE-7 ran an energy report macro reading compressor run hours from PLC-R2; the logger vendor confirmed an unused "PLC integration" feature on GW-LOG, enabled by default, which was disabled.

### 12.3 Approved but unused

HMI-C → PLC-R2 did not appear. Perhaps the window was short; perhaps the HMI reads PLC-R2 through PLC-R1. Unused approvals are candidates for removal after checking with operations — fewer open paths, less to defend.

Chapter 27 shows the risk of reading this too quickly. The observation window also missed the historian polling PLC-R2, so the flow matrix listed HIST → PLC-R1 only. When the new rule set went live, HIST stopped receiving PLC-R2 tags within four minutes and Priya rolled back. An approved-but-unseen flow is a question for operations and the vendors, not proof the flow is unused.

### 12.4 From comparison to change

Each unapproved flow gets an owner and a decision: approve with justification (and update the matrix), or block. Blocking happens in a planned window with operations informed, because a "mystery" flow may turn out to be something the plant needs.

Priya's two decisions: OFFICE-7's energy macro was moved to read run hours from the historian replica in the DMZ, and office → control was blocked in the 20 March maintenance window after the switch; GW-LOG's "PLC integration" feature was disabled with the logger vendor's agreement, and the flow disappeared without a firewall change.

### Worked example (synthetic NCS)

Priya asks the office: OFFICE-7 runs an energy report macro that reads compressor run hours directly from PLC-R2. She proposes reading the same values from the historian replica in the DMZ instead, then blocking office → control. For GW-LOG → PLC-R1 she contacts the logger vendor, who confirms an unused "PLC integration" feature enabled by default; it is disabled and the flow disappears.

> **Synthetic case — Northgate Cold Storage.** Flows and explanations are invented.

### Errors and limits

Observation windows miss monthly or seasonal flows such as defrost schedules or end-of-month reports. Ports do not prove protocol; a flow on 502 may not be Modbus.

### Exercises

- **EX034 — Classifying a new observation.** Add `("HMI-C", "PLC-R2", 502)` to `observed`. What changes in the output? *Rubric:* 3 = it prints approved and the not-seen list becomes empty; 2 = one effect; 1 = unapproved; 0 = none.
- **EX035 — Decision for OFFICE-7.** Write the decision record for the OFFICE-7 flow. *Rubric:* 3 = cause, replacement path via DMZ, block date, owner; 2 = three; 1 = "block it"; 0 = none.
- **EX036 — Why GW-LOG → PLC-R1 is suspicious.** Explain in two sentences. *Rubric:* 3 = no business need for logger gateway to speak Modbus; bridges internet-connected zone to control; 2 = one; 1 = vague; 0 = none.

### Synthesis

Comparing observed flows with an approved matrix finds the paths nobody intended, and each one ends in an owned decision.

### Continue studying — chapter 12 of 30

[← Chapter 11 (draft)](#ch-11) · [Course chapter index](../SUBJECTS.md) · [Chapter 13 (draft) →](#ch-13)

## Worked answers

<a id="answer-ex034"></a>
**EX034.** A new line `HMI-C -> PLC-R2 :502 approved` appears, and "approved but not seen" becomes an empty list `[]` because every approved flow has now been observed.

<a id="answer-ex035"></a>
**EX035.** "Flow OFFICE-7 → PLC-R2:502: energy report macro reading compressor run hours. Replacement: read run hours from the historian replica in the DMZ. Block office → control on 20 March in the maintenance window after the macro is switched. Owner: Priya Nair with the facilities manager."

<a id="answer-ex036"></a>
**EX036.** The logger gateway's only job is forwarding temperatures to the cloud, so it has no need to speak Modbus to a compressor controller. Because it is internet-connected, such a flow links an external service to the control zone.