Chapter 26 — Critical infrastructure and sector security: operational handoff

Open, free learning for anyone who wants to protect people and technology. No account is required to read this text or its worked answers.

Chapter 26 — Critical infrastructure and sector security: operational handoff

Lesson map

Lesson 26 published. Map, example, EX076.

flowchart TD
  N0["Learning outcomes and connection"]
  N1["26.1 What is handed over"]
  N2["26.2 Runbooks that work at 03:00"]
  N3["26.3 Health evidence"]
  N4["26.4 Running the handover"]
  N5["26.6 Practical activity: write and test a runbook"]
  N6["Chapter synthesis"]
  N0 --> N1 --> N2 --> N3 --> N4 --> N5 --> N6
  N6 --> EX["Worked example"]
  EX --> Q["Exercise EX076"]

Logical drawing

flowchart LR
  N0["Learning outcomes and connection"]
  N1["26.1 What is handed over"]
  N2["26.2 Runbooks that work at 03:00"]
  N3["26.3 Health evidence"]
  N4["26.4 Running the handover"]
  N5["26.6 Practical activity: write and test a runbook"]
  N6["Chapter synthesis"]
  N0 --> N1 --> N2 --> N3 --> N4 --> N5 --> N6 --> Q["EX076"]
[Learning outcomes and connection]
    |
    v
[26.1 What is handed over]
    |
    v
[26.2 Runbooks that work at 03:00]
    |
    v
[26.3 Health evidence]
    |
    v
[26.4 Running the handover]
    |
    v
[26.6 Practical activity: write and test a runbook]
    |
    v
[Chapter synthesis]
    |
    v
[Worked example] --> [Exercise EX076]

Learning outcomes and connection

After this chapter you should be able to:

A service is not finished when it works; it is finished when someone else can run it. Many security controls fail at handover: the person who understood the key rotation leaves the project; the on-call team never learned what Rule C's first action means; the backup restore was rehearsed only by its author.

26.1 What is handed over

A LANTERN handover pack contains:

26.2 Runbooks that work at 03:00

A good runbook is written for a competent colleague who has not seen this service before, under time pressure. It states its purpose and when to use it; prerequisites (access, tools, approvals); steps numbered, each with the exact command or action and what you should see; decision points ("if the relay log shows MAC failures, go to step 9; otherwise step 12"); safety notes where a step could affect operations; rollback; and how to record what was done. Test every runbook by having someone other than its author follow it on a test system and time it.

Core LANTERN runbooks: add or remove a station (standard change); rotate a station key; relay host rebuild; historian restore; respond to each alert rule; suspected relay compromise (first steps and escalation); planned maintenance with Water operations; enabling supplier access.

26.3 Health evidence

The receiving team should be able to answer "is LANTERN healthy?" in two minutes from a dashboard or a daily report: stations reporting / expected; accept, reject and quarantine counts per hour; relay resource headroom (Chapter 1); clock offsets; log-source freshness; last successful backup and last restore test; rules last evaluated; open alerts; silenced rules and their expiry (Chapter 25).

The handover in this chapter found the gap: the health report said "backups OK" but showed no restore-test date. For LANTERN the two-minute check would show 14 stations expected, accept, reject and quarantine counts, clock offsets against the 2 s alert, RLY-01's disk against its 85 % alarm, and any silenced rule with its expiry.

26.4 Running the handover

Handover is a process, not an email. Run it in stages: walk-through of the pack with the receiving team; shadowing, where the receiving team performs routine tasks with the project team watching; reverse shadowing, where the project team watches the receiving team handle an injected test alert and a runbook; and acceptance, where the service owner and receiving team lead sign off with open items listed. Agree an early-life support period in which the project team remains available.

Fallowmere's reverse shadowing used an injected Rule C alert for PS-09.

26.5 Worked example: a handover that found three gaps (synthetic)

During reverse shadowing, the FSTS operations team is given a test Rule C alert for PS-09. The on-call technologist follows the runbook and calls the Water control room — correctly — then checks carrier status as written. The runbook does not mention checking the relay's MAC-failure log, so the technologist calls BayTel; the injected cause was a key mismatch. Second, the key-rotation runbook refers to "the key store" without saying where it is or who has access; the receiving team cannot follow it. Third, the health report shows "backups OK" but not the last restore test date. All three are fixed before acceptance; the handover is delayed by a week, which is far cheaper than discovering the gaps during an incident.

26.6 Practical activity: write and test a runbook

Write the runbook "Respond to Rule C — station silent" using the structure in "Runbooks that work at 03:00" above, including the decision point from the worked example above ("a handover that found three gaps"). Ask a colleague (or, if studying alone, yourself after a day's break) to follow it against the Lab 20 data and note every place they hesitated.

Use the handover's lesson as the decision point: after calling the Water control room, check the relay's MAC-failure log for the silent station before calling BayTel. In the handover test the injected cause was a key mismatch, and the runbook without that step sent the on-call technologist to the carrier. With the Lab 20 data, the same step separates PS-07's lost messages from PS-09's clock offset.

26.7 Common errors and limits

The PS-09 drill caught the second error: "check carrier status" sent the technologist to BayTel for a key mismatch.

The "backups OK" line without a restore date is the third.

Exercises — chapter 26

EX076 — Runbook critique. Objective: improve a runbook. Inputs: "Key rotation: 1. Generate new key. 2. Put it on the relay and station. 3. Check it works. 4. Delete old key." Constraints: identify at least six problems. Steps: list problems and rewrite. Expected evidence: list and rewrite. Rubric: 3 = missing purpose and prerequisites, no store location or access, no overlap period (Chapter 18), no specific verification, no safety/operations notice, no rollback, deleting old key too early for backlog, no recording; rewrite addresses them; 2 = four or five; 1 = cosmetic; 0 = none.

EX077 — Health report. Objective: define health evidence. Inputs: Chapter 26 ("Health evidence"). Constraints: one screen; ten items maximum. Steps: choose items, give each a green/amber/red threshold, and say who reads it daily. Expected evidence: table. Rubric: 3 = items covering availability (stations reporting), integrity (reject/quarantine), capacity, time, logging, backup/restore, monitoring health and silences; thresholds sensible; reader named; 2 = eight items or thresholds weak; 1 = list without thresholds; 0 = none.

EX078 — Acceptance decision. Objective: decide whether to accept a handover. Inputs: all runbooks tested except historian restore (tested by its author only); two control cards lack evidence dates; one accepted risk (PS09-RTU unsupported) has owner and plan. Constraints: accept, accept with conditions, or reject. Steps: decide and justify, listing any conditions with dates. Expected evidence: paragraph. Rubric: 3 = accept with conditions: independent historian restore test within a short date, evidence for the two controls by a date, early-life support until conditions met; recognizes the accepted risk is properly handled; 2 = decision without conditions; 1 = accept unconditionally; 0 = none.

Chapter synthesis

A service is finished when others can run it. Hand over a pack with description, ownership, service levels, runbooks, control cards, monitoring, open items and evidence. Write runbooks for a competent colleague at 03:00 and test them with someone other than the author. Provide health evidence that shows effectiveness, not only configuration. Run handover as walk-through, shadowing, reverse shadowing and acceptance with early-life support, and fix the gaps it reveals.

Continue studying — chapter 26 of 30

← Chapter 25 · Course chapter index · Chapter 27 →

Continue to the next authored lesson.

Worked answers

EX076 — Runbook critique. Problems: no purpose or when-to-use; no prerequisites (access to the key store, approvals, Water informed); "generate" with no method (secure random source, where); no key-store location or custodian; no overlap period (backlog messages carry old-key MACs — Chapter 18); "check it works" without specific checks; no operations notice (stations may go silent); no rollback; deleting the old key immediately breaks backlog uploads; no recording of key version and time. Rewrite: purpose; prerequisites; generate in the key store; stage new key on relay (accept old and new); notify control room; cut over at station gateway; verify messages accepted with new key version and MAC-failure count zero; after 26–48 h remove old key and verify old-key test message rejected; rollback (revert station to old key during overlap); record.

EX077 — Health report. Items and thresholds (green/amber/red): stations reporting (14/14 / 13 / ≤ 12); reject + quarantine per hour (< 10 / 10–50 / > 50); relay disk days-to-alarm (> 30 / 10–30 / < 10); max clock offset (< 1 s / 1–2 s / > 2 s); log sources fresh (all / 1 stale / > 1 stale); last backup (< 24 h / 24–48 h / > 48 h); last restore test (< 90 days / 90–120 / > 120); rules evaluated (< 5 min / 5–15 / > 15); active silences (0 / 1 with expiry / any without expiry); open alerts older than 4 h (0 / 1–2 / > 2). Read daily at 08:30 by the FSTS operations lead.

EX078 — Acceptance decision. Accept with conditions: (1) historian restore runbook to be executed by a member of the receiving team, timed against the 4-h RTO, within two weeks; (2) evidence for the two controls without dates to be produced within two weeks; (3) early-life support from the project team until both conditions are met. The unsupported PS09-RTU is properly handled as an accepted risk with an owner and plan and does not block acceptance. Rejecting outright would delay a service that is otherwise ready; accepting unconditionally would leave the most important recovery capability proven only by its author.