Chapter 16 — Technical documentation and safety

Open, free learning for anyone who wants to protect people and technology. No account is required to read this text or its worked answers.

Chapter 16 — Technical documentation and safety

Lesson map

Lesson 16 published. Map, example, EX052.

flowchart TD
  N0["Learning outcomes and connection"]
  N1["16.1 The documents a technician owns"]
  N2["16.2 Safety comes first and belongs to operations"]
  N3["16.3 Transient devices and media"]
  N4["16.4 Secrets and sensitive information"]
  N5["16.6 Practical activity"]
  N6["Chapter synthesis"]
  N0 --> N1 --> N2 --> N3 --> N4 --> N5 --> N6
  N6 --> EX["Worked example"]
  EX --> Q["Exercise EX052"]

Logical drawing

flowchart LR
  N0["Learning outcomes and connection"]
  N1["16.1 The documents a technician owns"]
  N2["16.2 Safety comes first and belongs to operations"]
  N3["16.3 Transient devices and media"]
  N4["16.4 Secrets and sensitive information"]
  N5["16.6 Practical activity"]
  N6["Chapter synthesis"]
  N0 --> N1 --> N2 --> N3 --> N4 --> N5 --> N6 --> Q["EX052"]
[Learning outcomes and connection]
    |
    v
[16.1 The documents a technician owns]
    |
    v
[16.2 Safety comes first and belongs to operations]
    |
    v
[16.3 Transient devices and media]
    |
    v
[16.4 Secrets and sensitive information]
    |
    v
[16.6 Practical activity]
    |
    v
[Chapter synthesis]
    |
    v
[Worked example] --> [Exercise EX052]

Learning outcomes and connection

After this chapter you should be able to:

Chapters 1–15 produced findings, changes and evidence. This chapter is about the documents that make that work repeatable and safe, and about the safety rules that override any technical plan.

16.1 The documents a technician owns

Document Purpose Must contain
Work instruction Lets a competent colleague perform a task correctly Preconditions, numbered steps with expected results, stop conditions, rollback, who to call
Troubleshooting log Records an investigation as it happens UTC times, four labels (observed, inferred, done, open), evidence references
Change record Authorizes and records a change Before/after, reason, tests (Chapter 11), rollback, window, approver, verifier
As-built record States what is actually configured Versions, configuration digests (Chapter 14), deviations from design and their approval

Write steps as imperative actions with an observable result: "Run sshd -T | grep -i passwordauthentication; expect passwordauthentication no." A step without an expected result cannot be checked, and a document that cannot be checked will drift from reality.

16.2 Safety comes first and belongs to operations

In a water works, a substation or a hospital plant room, the people responsible for the physical process have authority over it. A technician's work there starts with their permission and stops at their request. Practical rules:

NIST SP 800-82 Rev. 3 discusses the relationship between OT security and safety (SP 800-82 Rev. 3); the UK NCSC Cyber Assessment Framework treats the operator's understanding of its essential functions as a foundation for security (NCSC CAF).

16.3 Transient devices and media

A laptop that visits stations, the control centre and the corporate office is a bridge across every zone. Controls a technician can apply:

The CISA performance goals list controls on removable media and on device configuration (CISA CPGs).

16.4 Secrets and sensitive information

Documents must not contain passwords, private keys, API tokens or one-time codes. Write "credential from vault entry kw-rtu-eng" instead of the credential. Network diagrams, register maps and firewall exports of critical infrastructure are sensitive: store them with access control, share them on a need-to-know basis, and remove them from tickets that go to suppliers. This book prints a few fake values only because they are fake.

The vault entry name can safely appear in a change ticket, because it tells an authorised engineer where to look without revealing anything an outsider could use. Real register maps and firewall exports deserve the same care as credentials, since together they describe how a station can be changed and from where.

16.5 Worked example: a work instruction (synthetic)

WI-KW-07 — Export KW-04 RTU configuration for drift baseline. Preconditions: change record CHG-2219 approved; Kestrel Water control room informed; engineering laptop ENG-L3 scanned today (record in the media log). Steps: (1) at 10:00 local, call the control room; record the operator's name. (2) On ENG-L3, open the vendor tool in read-only mode; expected: status bar shows "Online — read only". (3) Export the configuration to KW04-20261013.cfg; expected: file size between 40 and 60 kB. (4) Run sha256sum KW04-20261013.cfg; record the digest in CHG-2219. (5) Disconnect; inform the control room. Stop conditions: any alarm at KW-04; tool requests to switch to "online edit"; operator request. Rollback: none needed (read-only), but if any write is suspected, inform operations immediately and open an incident. Evidence: file, digest, call times.

16.6 Practical activity

Write a work instruction for the KW-04 router change from EX052, including preservation, the change, positive and negative tests, rollback and stop conditions. Ask someone else to read it and list every step where they would have to guess.

Include preservation of the router's configuration before the change, positive and negative tests afterwards, rollback steps and stop conditions that include any KW-04 alarm. Ask a colleague to mark every step where they would have to guess; those steps need an expected result or a screenshot of the vendor tool. Keep the reviewed copy with the change record.

16.7 Common errors and limits

Exercises — chapter 16

EX061 — Repair a work instruction. Objective: make steps executable. Inputs: "Log into the RTU (password Kestrel2024!) and check settings. Fix anything wrong. Tell ops when done." Steps: list the defects and rewrite. Expected evidence: defect list and rewritten instruction. Rubric: 3 = removes the credential (and recommends rotating it, since it has been written down), adds preconditions, read-only mode, expected results, stop conditions, informs operations before, replaces "fix anything" with a change record; 2 = most; 1 = cosmetic; 0 = none.

EX062 — Transient device policy. Objective: control a bridge across zones. Inputs: one engineer uses the same laptop for email and for station work. Steps: write a short technical policy and the transition plan. Expected evidence: policy and plan. Rubric: 3 = dedicated engineering laptops with a controlled image, no corporate or internet use, pre-visit check, media pool and log, connection record; transition that preserves the current laptop's project files after scanning; 2 = policy without transition; 1 = "be careful"; 0 = none.

EX063 — Safety boundaries. Objective: recognize what is out of bounds. Inputs: during a substation visit you find a protection relay with a default web password. Steps: state what you do and do not do, and how you record it. Expected evidence: short procedure. Rubric: 3 = do not log in or change it; record observation (device, time, how noticed); report to the Kestrel Grid protection engineer and the KVROC security lead; protection engineers decide and act; sensitive finding handled on need-to-know basis; 2 = right actions, weak record; 1 = changes the password; 0 = none.

EX064 — As-built record. Objective: document reality. Inputs: fw-01 after the EX038 fix and hist-02 after CHG-2207. Steps: draft an as-built record with versions, digests (placeholders allowed), deviations and approvals. Expected evidence: one-page record. Rubric: 3 = states actual configuration, includes digests and where they are stored, lists open deviations (REQ-3/4 before fix) with approvals or tickets, dated and signed; 2 = no deviations; 1 = copies the design; 0 = none.

Chapter synthesis

Good technical documents are executable and checkable: numbered steps with expected results, stop conditions, rollback and evidence. Safety and the authority of operations override every technical plan; protection and safety systems are out of bounds. Laptops and media that move between zones need their own controls, and secrets never belong in documents.

Continue studying — chapter 16 of 18

← Chapter 15 · Course chapter index · Chapter 17 →

Continue to the next authored lesson.

Worked answers

EX038 — Fix the policy. Remove R4 and R6. All five tests PASS (RDP and SMB now deny by R7; 10.20.0.12 denied by R7). R5 is now redundant with the default deny; keep it only if a separate log category for RDP attempts is wanted (then it should be placed above any allow), otherwise remove it. Before removing R4, check fw-01 logs for 30 days to list what used R4 and give each legitimate use its own conduit.

EX052 — Close the KW-04 path. Preserve the router configuration and its connection logs; remove the tcp/502 port-forward under a change approved by Kestrel Water; ask the carrier (via the contract owner) to remove reachability from the corporate remote-access VPN to the station private network; negative test from a marked VPN client to KW-04's carrier address; positive test of SCADA polling; then export and check all eleven other station routers for port-forwards and management exposure; add router configurations to drift detection. Owner: KVROC network lead, with Kestrel Water approval.

EX061 — Repair a work instruction. Defects: password in the document (and therefore compromised — rotate it); no preconditions or change record; no read-only mode; no expected results; "fix anything" authorizes unplanned change; operations told only afterwards; no stop conditions or rollback. Rewrite in the WI-KW-07 pattern: change record, control-room call before, vault reference for the credential, read-only export with expected results, findings recorded for a separate change, stop conditions, call after.

EX062 — Transient device policy. Policy: engineering work on control systems only from dedicated laptops built from a controlled image, never used for email or internet; pre-visit update and malware scan at a controlled station, recorded; removable media from a numbered pool, scanned, logged; every site connection recorded. Transition: scan the current laptop's project files on an isolated system, copy verified files to the new engineering laptop, record digests, then return the old laptop to corporate use only.

EX063 — Safety boundaries. Do not log in, test or change anything. Record device identity, location, time and how the condition was noticed (for example the login page displayed a default-credential notice in vendor documentation — not a login attempt). Report the same day to the Kestrel Grid protection engineer and L. Ferreira; the protection engineers decide on and make any change under their procedures. Store the finding with restricted access.

EX064 — As-built record. Example: fw-01 firmware version x.y; rule set digest (placeholder) stored in CHG-2215 and in the collector; rules R1, R2, R3, R7 as-built; deviation: R5 retained for logging (approved by L. Ferreira). hist-02: OpenSSH version; effective configuration digest from sshd -T; open deviation until EX010 is completed: histsvc shell; dated and signed by the implementer and verifier.