  N0["Learning outcomes"]
  N1["29.1 Monitoring that operators trust"]
  N2["29.2 Playbook steps"]
  N3["29.3 Patching in windows"]
  N4["29.4 Tabletop exercises"]
  N5["Synthesis"]
  N0 --> N1 --> N2 --> N3 --> N4 --> N5
  N5 --> EX["Worked example"]
  EX --> Q["Exercise EX085"]

Logical drawing

flowchart LR
  N0["Learning outcomes"]
  N1["29.1 Monitoring that operators trust"]
  N2["29.2 Playbook steps"]
  N3["29.3 Patching in windows"]
  N4["29.4 Tabletop exercises"]
  N5["Synthesis"]
  N0 --> N1 --> N2 --> N3 --> N4 --> N5 --> Q["EX085"]
[Learning outcomes]
    |
    v
[29.1 Monitoring that operators trust]
    |
    v
[29.2 Playbook steps]
    |
    v
[29.3 Patching in windows]
    |
    v
[29.4 Tabletop exercises]
    |
    v
[Synthesis]
    |
    v
[Worked example] --> [Exercise EX085]

Learning outcomes

You will (1) design an OT security monitoring workflow with operators in the loop; (2) write an incident-response playbook step that respects process safety; (3) plan patching within maintenance windows; and (4) run a tabletop exercise.

29.1 Monitoring that operators trust

Passive network monitoring at LDHP's control switch builds a baseline of who talks to whom. Alerts — a new host talking Modbus, a write from an unexpected source, a firmware download — go to a security analyst who calls the shift lead before anyone touches the plant. NIST SP 800-82r3 stresses that OT incident response must be coordinated with operations because containment actions can themselves cause a process upset.

At LDHP the alert in this chapter's tabletop, a Modbus write to register 100 by 10.20.4.17 on the office VLAN, is exactly the "unexpected source" case.

29.2 Playbook steps

Good OT playbook steps name the decision-maker and the safe state. "Isolate PLC-H from the network" is dangerous if operators lose the HMI. Better: "Shift lead decides whether to move the boiler to local manual control; only then does the analyst block the suspicious source at the firewall."

This chapter's tabletop followed this order: the analyst called the shift lead at 02:12, the operator restored the supply setpoint from 30 °C to 90 °C at 02:15, and the shift lead approved blocking 10.20.4.17 at the firewall at 02:18. The block came after the process was safe, not before, and after a named person had decided it.

29.3 Patching in windows

LDHP has a monthly four-hour maintenance window. Patches are tested on a bench HMI, ranked by risk (exposure × consequence), and applied in order until the window is full; the rest are deferred with a dated ticket and compensating controls. IEC TR 62443-2-3 discusses patch management in IACS environments.

For a month with a PLC-H firmware fix, an HMI-1 Windows update and a gateway patch, the ranking puts PLC-H first only if the fix addresses an exposed path; otherwise HMI-1, which holds named operator accounts and faces EWS-1 and the jump host, may come first. Whatever is deferred gets a dated ticket and the compensating controls of Chapter 24.

29.4 Tabletop exercises

A tabletop rehearses a scenario on paper: who is called, what is decided, what information is missing. It reveals gaps without risking the process.

LDHP's tabletop started from an alert at 02:10 on a January night: a Modbus write to PLC-H register 100 by 10.20.4.17 on the office VLAN. The analyst called the shift lead at 02:12, the operator confirmed the setpoint had been changed to 30 °C and restored 90 °C at 02:15, and the shift lead approved blocking the address at 02:18, after which evidence collection began. The gap it found was ordinary and important: nobody had the firewall administrator's night phone number. A live incident would have found the same gap with less time to fix it.

Synthetic case — Lakeside District Heating Plant. Times, addresses and the gap are invented.

Errors and limits

Playbooks rot as staff and networks change; review them after every exercise. Automatic blocking in OT should be exceptional and pre-agreed.

Exercises

Synthesis

OT operations security keeps operators in charge of the process, patches by risk within windows, and rehearses until gaps are found on paper rather than at 2 a.m.

Continue studying — chapter 29 of 40

← Chapter 28 (draft) · Course chapter index · Chapter 30 (draft) →