Chapter 22 — OT, IoT and cyber-physical security: data and dependencies

Open, free learning for anyone who wants to protect people and technology. No account is required to read this text or its worked answers.

Chapter 22 — OT, IoT and cyber-physical security: data and dependencies

Lesson map

Lesson 22 published. Map, example, EX064.

flowchart TD
  N0["Learning outcomes"]
  N1["22.1 Inventory first"]
  N2["22.2 Dependency chains"]
  N3["22.3 Supplier dependencies"]
  N4["22.4 People as dependencies"]
  N5["Synthesis"]
  N0 --> N1 --> N2 --> N3 --> N4 --> N5
  N5 --> EX["Worked example"]
  EX --> Q["Exercise EX064"]

Logical drawing

flowchart LR
  N0["Learning outcomes"]
  N1["22.1 Inventory first"]
  N2["22.2 Dependency chains"]
  N3["22.3 Supplier dependencies"]
  N4["22.4 People as dependencies"]
  N5["Synthesis"]
  N0 --> N1 --> N2 --> N3 --> N4 --> N5 --> Q["EX064"]
[Learning outcomes]
    |
    v
[22.1 Inventory first]
    |
    v
[22.2 Dependency chains]
    |
    v
[22.3 Supplier dependencies]
    |
    v
[22.4 People as dependencies]
    |
    v
[Synthesis]
    |
    v
[Worked example] --> [Exercise EX064]

Learning outcomes

You will (1) build an asset and dependency inventory; (2) trace data flows from field device to business use; (3) find single points of failure, including people and suppliers; and (4) use a software bill of materials to reason about inherited vulnerabilities.

22.1 Inventory first

You cannot protect what you have not listed. NIST SP 800-82r3 places asset inventory at the start of an OT security programme. A useful inventory records not only make, model and firmware but also function, zone, owner, criticality and what depends on the asset.

Maya's dependency list in this chapter starts from such an inventory: TT-101, PLC-H with firmware v3.2, FV-12, control switch SW-2, HMI-1, licence server LIC-1, EWS-1 and the vendor support contract. Recording v3.2 is what would let LDHP answer a PLC firmware advisory the same day; recording LIC-1 as a dependency of HMI-1 is what exposed a single point of failure no network diagram showed.

22.2 Dependency chains

PLC-H depends on 24 V power, its I/O modules, the control network switch, the engineering workstation for logic changes and the vendor for firmware. HMI-1 depends on Windows, the HMI runtime licence server and the domain controller for named accounts. A licence server outage that blanks HMIs is an availability incident with a cyber root cause, even with no attacker.

Maya marked LIC-1 as the hidden single point of failure and asked the HMI vendor about a licence grace period, which would let HMI-1 keep running if LIC-1 were down for a night.

22.3 Supplier dependencies

The meter gateway firmware embeds an open-source TCP/IP stack and a TLS library. If a vulnerability is published in the stack, every gateway inherits it. A software bill of materials (SBOM) lists such components so that, when an advisory appears, the plant can answer "are we affected?" in hours rather than weeks. CISA ICS advisories identify affected products and versions, which only helps if your inventory records versions.

Chapter 30's MTR-C is the case where an SBOM alone is not enough: even if it shows an affected stack, the device cannot be updated.

22.4 People as dependencies

If only one engineer can restore PLC-H's logic from backup, that person is a single point of failure. Document procedures and cross-train.

At LDHP the risk is sharpest at night in winter. If PLC-H's logic were corrupted, by a failed download from EWS-1 or deliberately, restoring it needs the last good program file, the matching firmware version (v3.2 in Maya's list) and someone who knows the restore steps on that controller. If that person is on leave in January, the boiler runs on local manual control until they return. Maya's recommendation was a written restore procedure, tested on the bench once a year by a second engineer, with the backup file's hash recorded beside each tested restore.

Worked example (synthetic LDHP)

Maya writes the dependency list for the supply-temperature function: TT-101, PLC-H (firmware v3.2), FV-12, control switch SW-2, HMI-1, licence server LIC-1, engineering workstation EWS-1, vendor support contract. She marks LIC-1 as a hidden single point of failure and recommends a licence grace-period check with the HMI vendor.

Synthetic case — Lakeside District Heating Plant. Versions and names are invented.

Errors and limits

An inventory built only from network scanning misses serial devices and switched-off spares, and active scanning can disturb fragile devices; combine passive capture, configuration exports and walk-downs.

Exercises

Synthesis

Inventories, dependency chains and SBOMs let a plant reason about failures and advisories before they arrive.